Thought I’d wander through the new bridge today and to much my surprise it looks like it’s got the finishing job of the of a 2012 peak boom apartment.

Anyone know what’s up with this surface finish? Looks like a rush job.

Posted by isolated_thinkr_

24 Comments

  1. Australian tradies 💪

    EBA rates, smoko, brb going to Fraser in my dual cab, early knock off Friday cause its pub time m8, bloody double bubble if you want me to turn up Monday

  2. ScissorNightRam on

    There’s something about the whole project that feels a little “off”. It’s bad juju or whatever.

  3. This wouldn’t have happened if they used the quality stuff from

    # HELLOOOOO, FRANK WALKER’S NATIONAL TIIIIIIILES

  4. Cost cutting by using 2nd grade tiles and shit grout. The whole project went over budget, so it was a rushed job in the end.

  5. Scooter-breath on

    Council are good on slack trades like this. If they say it needs fixing, it will be for sure.

  6. AltruisticSalamander on

    What, those inclusions? I’d assume it’s because it’s some kind of natural stone.

  7. The tiling job itself looks fine. The tiles themselves look like seconds. Damaged during production, visual defects etc etc so they’re sold for a quarter of the price. What else would you expect to be fair.

  8. They were definitely trying to rush this out as quickly as possible for the casino. There’s corners cut all over the project

  9. ColdDelicious1735 on

    I thought the pattern was supposed to look like fossils is it just dodgy products?