“The construction of the hydropower plant on the Una began with the demolition of a concrete dam with a culvert at the ‘collision’ of the construction site with the main stream. The issue of an unprofessionally prepared construction site, which is dangerous for the contractors themselves, continues after their departure, as water increasingly penetrates through the bags.
Posted by javnodobro